Direct concrete answer

How much concrete for a 20x30 foundation slab?

A 20 ft by 30 ft by 6 inch concrete slab requires 11.2 cubic yards of concrete, or 500 bags of 80-lb premix before field waste. With 10% overage, order about 12.3 cubic yards.

Quick answer

Project dimensions20 ft x 30 ft x 6 in
Area or count600 sq ft
Volume300.00 cubic feet
Volume11.2 cubic yards
Metric volume8.50 cubic meters
80-lb bags needed500 bags
60-lb bags needed667 bags
50-lb bags needed800 bags
Ready-mix order with 10% overage12.3 cubic yards
Ready-mix planning cost at $150/yd3$1,833
Bagged planning cost at $5/80-lb bag$2,500

Calculation steps

  1. Convert depth to feet: 6 inches / 12 = 0.500 ft.
  2. Calculate cubic feet: 20 ft x 30 ft x 0.500 ft = 300.00 ft3.
  3. Convert to cubic yards: 300.00 ft3 / 27 = 11.2 yd3.
  4. Add waste for ordering: 11.2 yd3 x 1.10 = 12.3 yd3. Round according to the supplier's ordering increment.

This is the exact math behind the answer, but the field order should reflect the actual formed dimensions, the base condition, and the supplier's minimum order policy. Measure the finished inside form dimensions. For this 20x30 slab, 6 inches thick, even a half-inch depth change across 600 sq ft changes the order.

Number of bags by size

Bag counts use common premix yields and round up to whole bags. Always check the yield printed on the exact product before buying because specialty mixes can differ.

Bag size Common yield Calculation Bags to buy
80-lb bag 0.6 ft3 300.00 / 0.6 500
60-lb bag 0.45 ft3 300.00 / 0.45 667
50-lb bag 0.375 ft3 300.00 / 0.375 800

Cost snapshot

At a planning price of $150 per cubic yard, the waste-adjusted ready-mix concrete is about $1,833 before short-load, delivery, pump, labor, forms, base stone, reinforcement, tax, or finish upgrades. The 80-lb bag material estimate is about $2,500 before mixer rental or labor.

Cost is where small concrete jobs surprise people. A short-load fee can make the delivered price look high, while bagged concrete can look cheap until the crew has to mix 500 heavy bags fast enough to place and finish one continuous surface. Use the material number as a quote starting point, not as the final installed price.

Ready-mix vs bagged concrete

Order ready-mix if schedule, access, and short-load fees make sense; use bags only when a truck cannot reach the pour or the crew can mix fast enough.

As a rule of thumb, ready-mix becomes easier once a project is near or above one cubic yard. This page's base volume is 11.2 cubic yards, so the practical choice depends on access, crew size, weather, finish timing, and whether the supplier charges a short-load fee. If the pour must be continuous, the truck often reduces risk even when the invoice includes a delivery charge.

Recommended PSI and reinforcement

Use Typical planning PSI Notes
Patio or walkway3,000 PSILight foot traffic on compacted base.
Garage floor3,500 PSIVerify vapor barrier, joints, and reinforcement.
Driveway3,500 to 4,000 PSIUse higher strength for trucks, RVs, or weak soil.
Footings3,000 to 4,000 PSIPlan and local code control final mix.

Use 3,000 PSI for many patios, walkways, and light pads; use 3,500 PSI or higher when loads increase.

A 6 inch slab is commonly paired with rebar or welded wire reinforcement when it carries vehicles, equipment, or concentrated loads.

Project-specific notes

This answer is for a 20 by 30 foundation slab. The geometry is straightforward, but the site details decide whether the estimate is clean in the field. Before ordering, compare the calculated dimensions against the actual form layout, the base depth, and the planned finish elevation.

  • A foundation slab is not just flatwork; vapor barrier, thickened edges, reinforcement, and inspections can change the final quantity.
  • Separate the main slab from footings, grade beams, and turndowns to avoid hiding structural concrete in an average thickness.
  • If the project includes thickened edges, a landing, a flare, a step, or a separate footing, calculate that concrete separately and add it to the base result.

Common mistakes

  1. Using drawing dimensions after forms have moved. Recheck inside length and width before ordering.
  2. Forgetting that thickness is converted to feet before multiplying. Four inches is 0.333 ft and six inches is 0.5 ft.
  3. Ordering the exact mathematical volume with no allowance for low spots, spillage, or surface finishing.

The expensive mistake is running short during placement. The second most expensive mistake is ordering more concrete than the site can place before it starts setting. The best order is not the smallest number; it is the number that fits the measured work, the crew, the truck access, and the supplier's rounding policy.

What to say when ordering

I am estimating a 20 ft by 30 ft by 6 inch concrete slab. My calculated volume is 11.2 cubic yards, and I want to plan around 12.3 cubic yards with 10% overage. Can you confirm the order size, mix strength, short-load fee, delivery charge, chute reach, and whether this job needs a pump or different placement method?

Related calculations

Sources and methodology

BuilderCalc uses standard geometric volume formulas, the 27 cubic feet per cubic yard conversion, common premix bag yields, and planning cost ranges that should be verified with local suppliers.