Direct concrete answer

How much concrete for 5 step stairs?

A 4 ft wide, 5-step concrete stair run requires 1.19 cubic yards of concrete, or 54 bags of 80-lb premix before field waste. With 12% overage, order about 1.4 cubic yards.

Quick answer

Project dimensions4 ft wide x 5 steps x 11 in tread x 7 in riser
Area or count5 solid steps
Volume32.08 cubic feet
Volume1.19 cubic yards
Metric volume0.91 cubic meters
80-lb bags needed54 bags
60-lb bags needed72 bags
50-lb bags needed86 bags
Ready-mix order with 12% overage1.4 cubic yards
Ready-mix planning cost at $150/yd3$200
Bagged planning cost at $5/80-lb bag$270

Calculation steps

  1. Convert tread and riser: 11 in tread = 0.917 ft; 7 in riser = 0.583 ft.
  2. Use stair volume factor: 5 steps create 15 tread-riser blocks in a solid stair mass.
  3. Calculate cubic feet: 4 ft x 0.917 ft x 0.583 ft x 15 = 32.08 ft3.
  4. Convert to cubic yards: 32.08 ft3 / 27 = 1.19 yd3.
  5. Add waste for ordering: 1.19 yd3 x 1.12 = 1.4 yd3. Round according to the supplier's ordering increment.

This is the exact math behind the answer, but the field order should reflect the actual formed dimensions, the base condition, and the supplier's minimum order policy. Concrete stair volume is a triangular step mass, not only the top tread area. Confirm the rise, run, width, and landing connection before estimating.

Number of bags by size

Bag counts use common premix yields and round up to whole bags. Always check the yield printed on the exact product before buying because specialty mixes can differ.

Bag size Common yield Calculation Bags to buy
80-lb bag 0.6 ft3 32.08 / 0.6 54
60-lb bag 0.45 ft3 32.08 / 0.45 72
50-lb bag 0.375 ft3 32.08 / 0.375 86

Cost snapshot

At a planning price of $150 per cubic yard, the waste-adjusted ready-mix concrete is about $200 before short-load, delivery, pump, labor, forms, base stone, reinforcement, tax, or finish upgrades. The 80-lb bag material estimate is about $270 before mixer rental or labor.

Cost is where small concrete jobs surprise people. A short-load fee can make the delivered price look high, while bagged concrete can look cheap until the crew has to mix 54 heavy bags fast enough to place and finish one continuous surface. Use the material number as a quote starting point, not as the final installed price.

Ready-mix vs bagged concrete

Small stair sets can use bags, but the formwork and finish timing often justify ready-mix if access is good.

As a rule of thumb, ready-mix becomes easier once a project is near or above one cubic yard. This page's base volume is 1.19 cubic yards, so the practical choice depends on access, crew size, weather, finish timing, and whether the supplier charges a short-load fee. If the pour must be continuous, the truck often reduces risk even when the invoice includes a delivery charge.

Recommended PSI and reinforcement

Use Typical planning PSI Notes
Patio or walkway3,000 PSILight foot traffic on compacted base.
Garage floor3,500 PSIVerify vapor barrier, joints, and reinforcement.
Driveway3,500 to 4,000 PSIUse higher strength for trucks, RVs, or weak soil.
Footings3,000 to 4,000 PSIPlan and local code control final mix.

Use at least 3,000 PSI for typical exterior steps and follow local requirements where stairs tie into structural work.

Outdoor stairs commonly need reinforcement tying the stair mass together. Use the project detail for bar size and spacing.

Project-specific notes

This answer is for a 4 ft wide, 5-step concrete stair run. The geometry is straightforward, but the site details decide whether the estimate is clean in the field. Before ordering, compare the calculated dimensions against the actual form layout, the base depth, and the planned finish elevation.

  • Five steps create enough mass that form bracing and placement sequence should be planned before mixing.
  • Confirm local stair geometry rules because a comfortable rise and run matter as much as concrete volume.
  • If the project includes thickened edges, a landing, a flare, a step, or a separate footing, calculate that concrete separately and add it to the base result.

Common mistakes

  1. Estimating only the visible tread surfaces instead of the solid stair volume.
  2. Changing riser height after the calculation without updating the order.
  3. Using a tight waste factor even though stair forms have more leakage and edge loss than a flat slab.

The expensive mistake is running short during placement. The second most expensive mistake is ordering more concrete than the site can place before it starts setting. The best order is not the smallest number; it is the number that fits the measured work, the crew, the truck access, and the supplier's rounding policy.

What to say when ordering

I am estimating a 4 ft wide, 5-step concrete stair run. My calculated volume is 1.19 cubic yards, and I want to plan around 1.4 cubic yards with 12% overage. Can you confirm the order size, mix strength, short-load fee, delivery charge, chute reach, and whether this job needs a pump or different placement method?

Related calculations

Sources and methodology

BuilderCalc uses standard geometric volume formulas, the 27 cubic feet per cubic yard conversion, common premix bag yields, and planning cost ranges that should be verified with local suppliers.